Nationwide permits

All 57 nationwide permits

This index covers the 2026 reissuance of the US Army Corps of Engineers nationwide permit programme, published in the Federal Register at 91 FR 768 on January 8, 2026. The permits take effect March 15, 2026 and expire March 15, 2031 unless the Corps reissues or modifies them first.

The 57 NWPs are numbered 1-25, 27-46, 48-55 and 57-60. NWPs 26, 47 and 56 are shown as [Reserved] in the final rule and are not active permits. 56 existing NWPs were reissued with modifications and one new NWP (60) was issued.

NWP 60 (Activities to Improve Passage of Fish and Other Aquatic Organisms) is new this cycle. Every other permit below was reissued with modifications from the prior cycle rather than created from scratch.

57 of 57 permits verified against 91 FR 768
All nationwide permits grouped by category, with acreage limit and PCN requirement
NWPTitleAcreage limitPCN required
Navigation and Structures
NWP 1Aids to NavigationNo acreage limit statedNever
NWP 2Structures in Artificial CanalsNo acreage limit statedNever
NWP 9Structures in Fleeting and Anchorage AreasNo acreage limit statedNever
NWP 10Mooring BuoysNo acreage limit statedNever
NWP 22Removal of VesselsNo acreage limit statedConditional
NWP 28Modifications of Existing MarinasNo acreage limit statedNever
Maintenance and Repair
NWP 3MaintenanceNo acreage limit statedConditional
NWP 31Maintenance of Existing Flood Control FacilitiesNo acreage limit statedAlways
NWP 41Reshaping Existing Drainage and Irrigation DitchesNo acreage limit statedNever
Fish and Wildlife
NWP 4Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and ActivitiesNo acreage limit statedNever
NWP 30Moist Soil Management for WildlifeNo acreage limit statedNever
Survey and Science
NWP 5Scientific Measurement DevicesNo acreage limit statedNever
NWP 6Survey ActivitiesNo acreage limit statedNever
Water Infrastructure
NWP 7Outfall Structures and Associated Intake StructuresNo acreage limit statedAlways
NWP 59Water Reclamation and Reuse Facilities0.5 acresAlways
Energy
NWP 8Oil and Gas Structures on the Outer Continental ShelfNo acreage limit statedAlways
NWP 12Oil or Natural Gas Pipeline Activities0.5 acresConditional
NWP 17Hydropower ProjectsNo acreage limit statedAlways
NWP 51Land-Based Renewable Energy Generation Facilities0.5 acresConditional
NWP 52Water-Based Renewable Energy Generation Pilot Projects0.5 acresAlways
Recreation
NWP 11Temporary Recreational StructuresNo acreage limit statedNever
NWP 36Boat RampsNo acreage limit statedConditional
NWP 42Recreational Facilities0.5 acresAlways
Bank and Shoreline
NWP 13Bank StabilizationNo acreage limit statedConditional
NWP 54Living ShorelinesNo acreage limit statedAlways
Transportation
NWP 14Linear Transportation Projects0.5 acresConditional
NWP 15U.S. Coast Guard Approved BridgesNo acreage limit statedNever
Dredging and Disposal
NWP 16Return Water From Upland Contained Disposal AreasNo acreage limit statedNever
NWP 19Minor DredgingNo acreage limit statedNever
NWP 35Maintenance Dredging of Existing BasinsNo acreage limit statedNever
Minor Activities
NWP 18Minor Discharges0.1 acresConditional
NWP 25Structural DischargesNo acreage limit statedNever
NWP 46Discharges in Ditches1 acreAlways
Emergency and Response
NWP 20Response Operations for Oil or Hazardous SubstancesNo acreage limit statedNever
NWP 37Emergency Watershed Protection and RehabilitationNo acreage limit statedConditional
NWP 45Repair of Uplands Damaged by Discrete EventsNo acreage limit statedAlways
Mining
NWP 21Surface Coal Mining Activities0.5 acresAlways
NWP 44Mining Activities0.5 acresAlways
NWP 49Coal Remining ActivitiesNo acreage limit statedAlways
NWP 50Underground Coal Mining Activities0.5 acresAlways
Administrative
NWP 23Approved Categorical ExclusionsNo acreage limit statedConditional
NWP 24Indian Tribe or State Administered Section 404 ProgramsNo acreage limit statedNever
NWP 32Completed Enforcement ActionsNo acreage limit statedNever
Restoration
NWP 27Aquatic Ecosystem Restoration, Enhancement, and Establishment ActivitiesNo acreage limit statedNever
NWP 53Removal of Low-Head DamsNo acreage limit statedAlways
Development
NWP 29Residential Developments0.5 acresAlways
NWP 39Commercial and Institutional Developments0.5 acresAlways
Temporary Works
NWP 33Temporary Construction, Access, and DewateringNo acreage limit statedConditional
Agriculture
NWP 34Cranberry Production Activities10 acresAlways
NWP 40Agricultural Activities0.5 acresAlways
Remediation
NWP 38Cleanup of Hazardous and Toxic WasteNo acreage limit statedAlways
Stormwater
NWP 43Stormwater Management Facilities0.5 acresConditional
Mariculture
NWP 48Commercial Shellfish Mariculture ActivitiesNo acreage limit statedConditional
NWP 55Seaweed Mariculture ActivitiesNo acreage limit statedAlways
Utilities
NWP 57Electric Utility Line and Telecommunications Activities0.5 acresConditional
NWP 58Utility Line Activities for Water and Other Substances0.5 acresConditional
Fish Passage
NWP 60Activities to Improve Passage of Fish and Other Aquatic Organisms1 acreConditional

The acreage limit and PCN column above are a screening summary, not the full rule text. Open a permit for its official summary, the exact PCN trigger language, its source citation, and what PermitBird does not yet cover at the district and state layer.